About This Project

Client Background

Portlaoise General Hospital embarked on an extension project to enhance its facilities. This expansion required the installation of specialised doors to meet strict healthcare requirements. MF Services worked with the contractor and the design team to deliver our Dl Clean and RS door solutions.

The Challenge

The hospital needed doors that:

  • Supported rigorous hygiene standards
  • Ensured staff and patient safety
  • Allowed wide access for wheelchairs, trolleys, and beds
  • Incorporated sealed systems for infection control
  • Provided privacy via integrated blinds
  • Durable and secure under frequent use

The Goal

  • Installation high quality, long lasting and compliant products that met the strict healthcare requirements.
  • The Installation was in a live busy hospital environment so there had to be minimal disruption to day to day activities.
  • The products needed to  create sterile, secure, and seamless spaces for medical treatment. They needed  to help infection control, operational efficiency, and patient privacy.

🔗Learn more about our Automatic Sliding Doors

Products & Services Delivered By MF Services

These Products Included

MF Services supplied and installed two key door solutions, tailored to the hospital’s unique requirements:

HDS Hygienic Sliding Automatic Doors (Double x12)

  • Vision panels with manually operated blinds (knob-controlled)
  • Wall-mounted and set to a closed default position
  • Activation via BEA Magic Switch (contactless motion detection)
  • Fitted with EN16005-compliant infrared safety sensors
  • Designed to reduce contamination risk and improve ease of use

Port Alp RS Complete Door System (Double with Side Screens)

  • Double-glazed G38 door leaves with side screens
  • Integrated interlocking weather seals
  • Activated by radar and protected by active infrared sensors
  • Fully integrated with the hospital’s fire alarm system

Why These Products Were Chosen

  • Designed for airtight sealing, essential for infection prevention
  • Equipped with obstruction detection and automatic reopening
  • Manual override in case of power loss
  • Easy to operate, with smooth and lightweight motion, ideal for high-traffic healthcare environments
  • Fire system integration for added safety

🔗 Learn more about our Healthcare Door Solutions
🔗 Explore our Automatic Door Solutions

Project Implementation

Execution & Coordination

MF Services followed a well-structured plan to meet hospital standards and deadlines:

  • Submitted detailed drawings and won the competitive tender
  • Installation completed in under two weeks
  • Integrated glass components had longer lead times and were installed once Doyle Construction completed the building’s structure

On Site Collaboration:

  • All MF Services staff undertook site inductions.
  • PPE compliance: safety helmets, high-vis vests, boots, glasses, and cut-resistant gloves
  • Heavy doors were installed using lifts, trolleys, and lifting lings across ground and first floors

🔗Click here to learn more about hermetic sliding doors

Results

Key Results Included

  • Airtight, Hygienic Environment: Hermetic seals reduce airborne contaminants and enhance infection control
  • Enhanced Safety: The doors support smooth wheelchair/trolley movement and prevent injury with controlled opening force
  • Seamless Flow: Improved movement for staff and patients in critical care areas
  • Efficient Installation: Completed in less than two weeks despite.
  • Professional Aesthetic: Modern, functional doors complement the hospital’s clean and clinical design

Project Duration

  • Initially MF Services submitted detailed drawings and won the competitive tender
  • Installation completed in under two weeks

🔗Click here to learn how we can help elevate the healthcare sector

🔗Click here to learn about another project in the healthcare sector

Need A Similar Solution?

Are you interested in upgrading your healthcare facility?

View our range of healthcare doors here.

Contact us today 

contact@mfservices.ie

021 4348996

Follow us:  

Read More Case Studies

Health Sector
Bon Secours Hospital Cork

MF Services provide Access Control, CCTV, Parking and Door Automation throughout the hospital

Read Case Study
Industrial Sector
Carbon Chemicals Group

MF Services provides a range of services to this company including CCTV, Automatic Gates, Barriers and Access Control

Read Case Study
Public Sector
Louth County Council

MF Services have supplied 230 Pay & Display Machines across Dundalk & Drogheda Towns

Read Case Study
Health Sector
South Infirmary Victoria Hospital

MF Services provided GRP Swing Doors, Hermetic Sliding Doors with full Theatre Control Panel Integration

Read Case Study
Public Sector
Kilkenny County Council

MF Services replaced all existing 65 Pay & Display Parking Machines around Kilkenny Castle

Read Case Study
Public Sector
Kerry County Council

MF Services replaced all existing 97 Pay & Display Parking Machines for Kerry County Council

Read Case Study
Health Sector
Mercy University Hospital, Cork

MF Services provided Theatre Access Control Integration and specialised hygienic doors for the Mercy Hospital

Read Case Study
Health Sector
Midland Regional Hospital Portlaoise

MF Services provide Access Control Integration solutions with Full Server Ipgrade and Door Automation to the Midland General Hospital Portlaoise

Read Case Study
Health Sector
Bon Secours, Limerick

Smart Parking & Fire-Rated Doors at Towlerton Medical Building

Read Case Study
Health Sector
Smart Parking System | Mater Private Hospital, Dublin

The installation of the Amano smart parking system in the Mater Private Hospital, Dublin

Read Case Study

Contact us

MF Services 

Unit 26 Doughcloyne Court Industrial Estate 

Sarsfield Road 

Wilton, Cork, Ireland

Icon
Sat Nav: Cork N 51° 52.433’ W 8° 30.761’

Send us an email